Week 13
Title: Testing and Troubleshooting
Objective: To test the functionality of my project
Progress:
This week, I need to test the functionality of my project after installed in the prototype. I combined all the circuits into the tupperware. This to save some space for the prototype. I also adjust the coding so that I can get the best output result on the LCD. Based on my coding, the temperature has been set for the fan to turn are at 31 degree celsius and for the peltier to turn on are at 32 degree celsius. The test are run for three different days. The first and the second day come out with unsatisfied result but on the third day, the result obtained are satisfied.
The pictures below showed the initial testing results of the hardware.
Objective: To test the functionality of my project
Progress:
This week, I need to test the functionality of my project after installed in the prototype. I combined all the circuits into the tupperware. This to save some space for the prototype. I also adjust the coding so that I can get the best output result on the LCD. Based on my coding, the temperature has been set for the fan to turn are at 31 degree celsius and for the peltier to turn on are at 32 degree celsius. The test are run for three different days. The first and the second day come out with unsatisfied result but on the third day, the result obtained are satisfied.
The pictures below showed the initial testing results of the hardware.
complete design of the project
initial temperature
final temperature
Conclusion:
By the end of this week, I have done the testing and troubleshooting the project. This process is to ensure that my project can function well and as I desired
By the end of this week, I have done the testing and troubleshooting the project. This process is to ensure that my project can function well and as I desired
No comments:
Post a Comment